Link arm 1-leaf

FDC 36 with standard rod * Overhead door closer with link arm for single leaf doors with a leaf width of up to 1400 mm

FDC 36
  • Closing force with variable adjustment EN 3-6
  • Can be used for right and left hand doors without conversion
  • Closing speed can be individually adjusted
  • Integrated back check, slows down doors that are thrown open forcefully
  • All functions can be set from the front (except for closing force)
Contact us

Application Areas

  • Right and left single-action doors
  • Single-action doors up to 1400 mm leaf width
  • Door leaf installation opposite hinge side
  • Transom installation opposite hinge side

Technical data

FDC 36 with standard rod
Leaf width (max.) 1400 mm
Type of installation Door leaf installation hinge side, Transom installation opposite hinge side, Door leaf installation opposite hinge side
Opening angle (max.) 180 °
Length 227 mm
Width 46 mm
Height 60 mm
Adjustable closing speed Yes
Latching action adjustable Yes, via valve

Downloads

Supplementary sheet

Certificate

Installation drawing

Product data sheet

Variants & Accessories

Contact

GEZE Central +65-684-613-38